Friday, April 3, 2020

Root 3 CNC - Installing the Endstops

The endstop wire assemblies were prepared in the last step.  Each of the limit switch bores was tapped for M3 screws, then installed to min/max positions on the machine.

X - Axis:



Y - Axis:




Z - Axis:

 


The machine wiring (pulled in a previous step) originates at the control panel and routes through the drag chains up to the endstop locations.  The wire ends were finished with JST connectors, and mounted with tie zips or anchors depending on their location.





No comments:

Post a Comment